Upgrade from i-doit open to i-doit#
How do you switch from i-doit open to i-doit with added functionality in a quick and easy way?
Motivation#
What are the advantages of documenting the IT infrastructure rather with the i-doit version than with the i-doit open version? The reason is simple: i-doit offers considerably more functions which can be of great help for your daily work.
i-doit in Seven Steps#
Here is a quick overview about the necessary steps before going further into details:
- Preparation
- Download and implementation of the update
- Installation of the i-doit extension
- License activation
- Clear cache
- Configure permissions
- Finishing work
Preparation#
Important: This procedure is irreversible. It is essential to create a backup! After upgrading, a valid license for i-doit is required. The system requirements and system settings must also be met.
Should you use an older version of the i-doit open installation, you have to bear the following facts in mind:
- When you use i-doit open version 0.9.x or older, an upgrade is not possible.
- When you use i-doit open 1.4.x, you have to upgrade to the newest version starting from version 1.8.
- When you have installed i-doit open 1.8.x or higher, you can continue with the upgrade.
You can download the most current version from i-doit.org.
Download and Implementation of the Update#
Download the update package of i-doit from the customer portal and carry out an update in the usual way. It is important that the version number of the installed i-doit open version corresponds to the desired i-doit version. Example: You have to use update package i-doit 1.8, when your installed version is i-doit open 1.8.
The upgrade doesn't work with the installation packet of the i-doit version.
Installation of the i-doit-addon#
After upgrading to the version you have to install the addon. The addon is available in the admin center under Add-ons. Here you can find the installation button.
License Activation#
The upgrade is completed now and the last step is the activation of a valid license. You can activate it directly in the Admin Center under Licenses.
Clear Cache#
Now we log off from the Admin Center and log in again to i-doit. Now we click through Administration → System tools → Cache / Database to the button Clear complete Cache. We clear the browser cache by pressing CTRL+F5.
Configure Permissions#
In contrast to i-doit open, i-doit does possess a free configurable authorization system. For this reason, the user who is logged in at this moment will not have all permissions.
To give your admin-user full access in a few steps, go to Administration → Authorization system → Authorization system reset and give your user full access to i-doit by entering the credentials for the Admin center.
Now you can configure the assignment of permissions for persons and groups of persons.
Finishing Work#
If you have not yet done so, you should carry out the following steps to ensure a flawless performance of i-doit:
- Set up and test Backup and Restore
- Set up Cronjobs (with the controller)
- Carry out an optional update to the current i-doit version: With a valid license it is possible and recommended that you always update to the newest version of i-doit.
Downgrade to i-doit open?#
It's not intended to go back to an older version of i-doit. This is also the case for downgrades from i-doit to the i-doit open variant.